Houses, shops and the odd café, across Christchurch.
2025
A 1920s villa taken off its original wiring over three weeks, with the family staying in it the whole time. New switchboard, every circuit RCD protected, and the original skirting put back where it came from.
Power and lighting for a new café, wired overnight across two weeks so the build could carry on through the day. Three-phase to the kitchen, and a lighting plan that suits both the breakfast rush and the evenings.
2024
A ceramic fuse board from the sixties swapped for a modern switchboard in a single day, with every circuit tested and labelled before the power went back on.